The Town of Stratham is required to comply with the US Environmental Protection Agency (EPA)'s New Hampshire Small MS4 General Permit. This page has been compiled to illustrate the Town's compliance with this permit as well as to provide educational materials to the residents of Stratham... we all play a role in assisting with compliance!
Public comment on Stratham's Stormwater Management Program is accepted on an ongoing basis. The document was updated in 2024 and is available for review here: SWMP Comments should be directed to the Town Planner by letter or email.
What areas of Stratham are regulated by this permit? Click on the following to see Stratham's MS4 area - VIEW MAP
Did Stratham file a Notice of Intent (NOI)? YES! VIEW NOTICE OF INTENT
Did Stratham receive authorization? YES! VIEW AUTHORIZATION
See details below on how Stratham is complying with the Minimum Control Measures of the permit:
MCM # 1, Public Education and Outreach: Please click on the following links for tips on how you can prevent stormwater pollution!
MCM # 2, Public Involvement and Participation
MCM # 3, Illicit Discharge Detection and Elimination (IDDE) Program
MCM # 4, Construction Site Stormwater Runoff Control
Stratham's Stormwater Regulations are Addendum C of the Site Plan Review Regulations.
The fact sheets below contain information on the US Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System Construction General Permit (CGP) and general construction best management practices. Though the fact sheets cover several important requirements from the CGP, please see EPA’s CGP webpage to learn more about the other permit requirements.
EPA Construction General Permit for Construction Sites Fact Sheet
Construction Site Erosion and Sediment BMPs Fact Sheet
MCM # 5, Stormwater Management in New Development and Redevelopment
Assessment Report for street design, parking lots, green roofs, and green infrastructure
Municipal Inventory and Priority Ranking for stormwater BMP retrofit
MCM # 6, Good Housekeeping for Municipal Operations
**NOTE: This page will be updated continuously as more information is made available in accordance with the permit term.**